Clearing Time
The total time between the beginning of the overcurrent and the final opening of the circuit at rated voltage by an overcurrent protective device. It is the total of the melting time and the arcing time.
The total time between the beginning of the overcurrent and the final opening of the circuit at rated voltage by an overcurrent protective device. It is the total of the melting time and the arcing time.
| TOP 5 |
1. Electricians
|